The lower floor is now completely framed and sheeted. Floor joists should be complete tomorrow for the final level.
In this photo the framing crew is working away while a fire hydrant and water are being installed as well.
The fire hydrant!
Windows are being cut into the sheeting in this photo. Things like flooring, cabinet colors, counters, roofing and the selection of stone for use a few places are on the list to be completed soon, so they can be ordered in time to keep things moving along!