Here we are in October!

We are now operating the vocational part of the project in the shop building, have hired a house parent, irrigation for the vineyard is in place and here are the latest photos of the home:

Drone photos of Ridgeview
Ridgeview the Lake and the City of Chelan
Views of Chelan Butte!
One more showing the location, both close to town and having some room!
Welcome Home!
Relax on the deck
Front View of the Home
East side of the home
A short commute to the office…
A really great room!!
And, there’s more!
Spacious and social
The view of Chelan Butte!
Large pantry with fridge and freezer.
The Media/Video Game Room!
Cubbies for bins with gloves, boots, hats, etc. on the way to the laundry room. The row of coat hooks across from them are yet to be installed.
Laundry with storage and a couple each washers and dryers.

 

There is a wash sink too.
Yes, there is a hallway.
Each Owner/Resident room has its own bathroom, walk in closet, desk area, sitting area and television connection.
Another angle on the Owner/Resident room.
There are two options for floors and tile work in the Owner/Resident Bathrooms.
The showers are low entry so they can be converted for assisted wheelchair use and headers for rails are already in the walls.
An Owner’s closet.
The other tile/floor choice. Header for rails are around the toilets too.
Resident shower tile with low entry shower. Converts for assisted wheelchair use.
Light, bright and tall ceilings in the House Parent quarters
Entry and desk areas for House Parents quarters
House Parent living and deck entrance
House Parent quarters sinks
Walk-in closet for House Parents
Part of House Parent quarters
Guest rooms, with bathrooms, for visitors, guests, family, etc.
There are 2 guest rooms for visiting family, interns, or invited guests.
The yet to be outfitted with equipment workout room.
So guests, visiting family, interns, etc. can do laundry without altering the regular routine.
This leads past the utility room and heated storage rooms to the office
Office and records area for the caregivers, care plans, etc.

Wow, great photos as yesterday of Ridgeview at Lake Chelan

Thanks Jerry Isenhart for the great photos and videos of Ridgeview at Lake Chelan!

https://photos.google.com/share/AF1QipPmpRRBY-vpQ6a-Jv35nHMQTQ6RsPhowI2SKhqsXXHn47bA4kO4TI2oWe_awM42Og?key=OUJiVGNRME1ZeXNDU0JNNTZ5aFV2c1Q5TjFRRVBB

Here’s a video: https://goo.gl/photos/Hjxew9wf7rv8Y2ym8

These show the shop going up on the outside, final grading happening, etc.  On the inside, finish electrical and plumbing are happening and final cleanup is in 2 weeks with furniture going in after that.

 

A couple of new details….

The stone was put on the fireplace today:

Yes, that is even sunshine out there!

And, the soffits above the deck are mostly done:

Soffits at Ridgeview Place in Chelan

The cabinets are all installed, trim is going in inside and flooring.  There are lots of things coming together at this point in the construction.

Let me know if you want to have a look!

1st of March Update on Ridgeview Place in Chelan!

There is lots of news on our Ridgeview Place project in Chelan!

Construction first, cabinets and flooring are going in inside and finish carpentry is getting started.  The exterior siding is being completed and paint will start soon after that.  The weather should soon cooperate to allow us to finish the slab for the shop area and dig in the sewer connection.  It could have an occupancy permit in May!  We are even ordering furniture.

This is turning into a home with incredible spaces in one of the most stunning settings in the country!

Here are some photos:

Boxes of cabinets about to be installed.
We still have snow on the ground, and great views from the great room at Ridgeview Place.
Quite a few cabinets….
The siding is mostly done….
Progress looks like this in construction!

On other fronts, we have some interested families that we have started talking with about possibly participating in the project.  We have drafts being done of the much of the associated paperwork.

The vocational side of the project is growing at an incredible pace and is on track to meeting our financial goals for it.

It is an exciting time for this project as it all begins to come together!!

10-22 Construction Update

20161022_121256

Things continue to move along at Ridgeview.  More sheeting on the roof is being done as the rafters are all in place now including over some of the outside areas.

The roof at Ridgeview is pretty dramatic, with tall soaring areas, skylights and other detailing.

Some ceiling detail in the caregivers' apartment.
Some ceiling detail in the caregivers’ apartment.

It is pretty exciting as I really had not grasped how beautiful the spaces are from the plans.

Entry and deck roof sheeting
Entry and deck roof sheeting

It looks like we should achieve being basically weathered in by the end of November.

Skylights
Skylights

These skylights are quite a ways up!

The foundation has been excavated for the shop/work area as well.  Ideally that will also be formed and poured in the next month as well.