Things continue to move along at Ridgeview. More sheeting on the roof is being done as the rafters are all in place now including over some of the outside areas.
The roof at Ridgeview is pretty dramatic, with tall soaring areas, skylights and other detailing.
It is pretty exciting as I really had not grasped how beautiful the spaces are from the plans.
It looks like we should achieve being basically weathered in by the end of November.
These skylights are quite a ways up!
The foundation has been excavated for the shop/work area as well. Ideally that will also be formed and poured in the next month as well.