Framing the lower floor is moving right along…

Here are a couple of photos from framing all the way back from Monday.  The internal walls are probably about done now.  Also, power and sewer connections have been brought on site.  Next week, more framing and the extension of the water main, fire hydrant and water line.

Framing of the lower floor or Ridgeview Place at Lake Chelan
Framing of the lower floor or Ridgeview Place at Lake Chelan

20160801_144211[1]

Slab is poured, Lumber on Tuesday and Framing on Wednesday!

Finishing the basement slab

Freshly poured basement slab

The slab was poured today.  43 cubic yards of fun!  Some additional footings for posts will be poured Monday and Tuesday.  On Tuesday, lumber arrives and on Wednesday the framing crew starts.

 

 

The latest construction photos show the foundation work nearly done

The foundation is back filled and preparation for the slab is nearly complete.  Some plumbing needs to be added, and then the slab can be poured.  After that, wood should start going into the air!

Meanwhile, things like water, power, etc are being worked on to be brought up to the project.

Here are photos from this morning:

20160623_100828[1]

20160623_100849[1]

20160623_100901[1]

20160623_100920[1]

20160623_101018[1]

20160623_101039[1]