Construction Update 8-18-2016 for Ridgeview Place at Lake Chelan

Floor Joists going in

The lower floor is now completely framed and sheeted.  Floor joists should be complete tomorrow for the final level.

Framing and utility work underway

In this photo the framing crew is working away while a fire hydrant and water are being installed as well.

Fire Hydrant being installed

The fire hydrant!

Sheeting and framing

Windows are being cut into the sheeting in this photo.  Things like flooring, cabinet colors, counters, roofing and the selection of stone for use a few places are on the list to be completed soon, so they can be ordered in time to keep things moving along!